1 00:00:06,789 --> 00:00:04,870 good afternoon everybody and welcome to 2 00:00:08,230 --> 00:00:06,799 the johnson space center here in houston 3 00:00:09,990 --> 00:00:08,240 texas we're going to be giving you a 4 00:00:12,629 --> 00:00:10,000 look today at two spacewalks that are 5 00:00:14,070 --> 00:00:12,639 coming up for the crew of expedition 32 6 00:00:15,990 --> 00:00:14,080 the first one is going to be on august 7 00:00:17,830 --> 00:00:16,000 the 20th the second one is going to be 8 00:00:20,150 --> 00:00:17,840 on august the 30th here to give us more 9 00:00:22,150 --> 00:00:20,160 details about all of that is the lead 10 00:00:23,990 --> 00:00:22,160 flight director for expedition 32 dina 11 00:00:25,670 --> 00:00:24,000 contella as well as the spacewalk 12 00:00:26,870 --> 00:00:25,680 officer keith johnson we'll start off 13 00:00:27,990 --> 00:00:26,880 with dina 14 00:00:29,189 --> 00:00:28,000 well good afternoon thank you for 15 00:00:30,710 --> 00:00:29,199 joining us 16 00:00:32,709 --> 00:00:30,720 things are going extremely well on space 17 00:00:34,150 --> 00:00:32,719 station and our crew is in great spirits 18 00:00:36,709 --> 00:00:34,160 looking forward to our pair of space 19 00:00:37,670 --> 00:00:36,719 walks coming up 20 00:00:40,150 --> 00:00:37,680 the 21 00:00:41,590 --> 00:00:40,160 increments about halfway over and 22 00:00:44,310 --> 00:00:41,600 the first part of the increment was 23 00:00:47,110 --> 00:00:44,320 crammed full of visiting vehicles 24 00:00:49,430 --> 00:00:47,120 following the soyuz arrival we had 25 00:00:51,670 --> 00:00:49,440 the 47 progress that undocked and we 26 00:00:53,510 --> 00:00:51,680 were performing a coors 27 00:00:56,470 --> 00:00:53,520 navigational system 28 00:00:58,709 --> 00:00:56,480 redoc test and for that redoc test the 29 00:01:00,549 --> 00:00:58,719 first attempt was aborted 30 00:01:03,430 --> 00:01:00,559 and i'm sure you've heard that 31 00:01:06,149 --> 00:01:03,440 the the coors system did not activate 32 00:01:07,510 --> 00:01:06,159 properly and so while the while our 33 00:01:09,030 --> 00:01:07,520 russian colleagues 34 00:01:11,670 --> 00:01:09,040 worked on what we were going to do for a 35 00:01:14,950 --> 00:01:11,680 re-dock attempt we did go ahead and 36 00:01:17,109 --> 00:01:14,960 rendezvous and capture htv our japanese 37 00:01:19,350 --> 00:01:17,119 cargo vehicle and the ground and the 38 00:01:21,350 --> 00:01:19,360 crew did an excellent job with that and 39 00:01:23,749 --> 00:01:21,360 then they birthed it on the same day and 40 00:01:26,230 --> 00:01:23,759 the following day uh 47 progress did 41 00:01:27,270 --> 00:01:26,240 come in with a successful docking the 42 00:01:29,830 --> 00:01:27,280 course 43 00:01:31,670 --> 00:01:29,840 in ah that new system was warmed up 44 00:01:33,910 --> 00:01:31,680 inside the progress just a few degrees 45 00:01:35,429 --> 00:01:33,920 but enough to allow its activation and 46 00:01:38,789 --> 00:01:35,439 so that's how we were able to 47 00:01:41,190 --> 00:01:38,799 successfully dock 47 progress 48 00:01:44,550 --> 00:01:41,200 47 progress undock went extremely well 49 00:01:46,069 --> 00:01:44,560 and 47 progress or 48 progress uh launch 50 00:01:48,950 --> 00:01:46,079 and docking occurred on the same day 51 00:01:51,109 --> 00:01:48,960 which was a a new test of a four orbit 52 00:01:53,990 --> 00:01:51,119 rendezvous capability and that went 53 00:01:55,749 --> 00:01:54,000 exactly as according to plan 54 00:01:58,310 --> 00:01:55,759 since since then we've been doing a lot 55 00:01:59,990 --> 00:01:58,320 of research and also a lot of robotic 56 00:02:00,950 --> 00:02:00,000 operations associated with the exposed 57 00:02:02,870 --> 00:02:00,960 pallet 58 00:02:05,910 --> 00:02:02,880 to move some research that was 59 00:02:08,630 --> 00:02:05,920 externally brought up in htv over to the 60 00:02:11,589 --> 00:02:08,640 space station over to the japanese 61 00:02:13,110 --> 00:02:11,599 the japanese module exposed facility and 62 00:02:15,430 --> 00:02:13,120 also to 63 00:02:16,949 --> 00:02:15,440 out out on the truss and so those 64 00:02:18,309 --> 00:02:16,959 operations went very smoothly and we 65 00:02:21,670 --> 00:02:18,319 only had 66 00:02:24,150 --> 00:02:21,680 the only hiccup that has affected our 67 00:02:26,949 --> 00:02:24,160 operations has been um the 68 00:02:29,990 --> 00:02:26,959 uh a camera that failed on the ssrms 69 00:02:31,509 --> 00:02:30,000 canada arm 2. it's a boom camera and 70 00:02:32,869 --> 00:02:31,519 after some discussions we decided that 71 00:02:35,509 --> 00:02:32,879 we're going to change that out on this 72 00:02:37,430 --> 00:02:35,519 upcoming usc va and keith johnson will 73 00:02:38,710 --> 00:02:37,440 talk about about all those details 74 00:02:40,070 --> 00:02:38,720 coming up 75 00:02:42,949 --> 00:02:40,080 so but then to talk a little bit about 76 00:02:45,030 --> 00:02:42,959 um you know our crew and operations uh i 77 00:02:47,030 --> 00:02:45,040 wanted to point out that we are despite 78 00:02:48,229 --> 00:02:47,040 all the visiting vehicles um at this 79 00:02:50,550 --> 00:02:48,239 point anticipating that we're going to 80 00:02:51,910 --> 00:02:50,560 meet our research objectives for this 81 00:02:54,949 --> 00:02:51,920 part of 82 00:02:57,350 --> 00:02:54,959 the of the year and that's an incredibly 83 00:02:59,350 --> 00:02:57,360 big step because we have had a lot of 84 00:03:01,350 --> 00:02:59,360 systems type of work that we've had to 85 00:03:03,430 --> 00:03:01,360 do associated with the vehicles but 86 00:03:05,670 --> 00:03:03,440 we're very proud that we've enabled the 87 00:03:07,270 --> 00:03:05,680 crew with a lot of opportunity to 88 00:03:08,309 --> 00:03:07,280 get ahead the crew has been doing a 89 00:03:10,149 --> 00:03:08,319 great job 90 00:03:12,470 --> 00:03:10,159 and i think as an example we had a lot 91 00:03:14,470 --> 00:03:12,480 of ground control uh that was associated 92 00:03:15,910 --> 00:03:14,480 with robotic ops and this enabled the 93 00:03:17,110 --> 00:03:15,920 crew to focus on research and that sort 94 00:03:18,630 --> 00:03:17,120 of thing on board while the ground did a 95 00:03:21,110 --> 00:03:18,640 lot of the robotic operations so 96 00:03:23,030 --> 00:03:21,120 congratulations to our japanese canadian 97 00:03:25,270 --> 00:03:23,040 and houston robotics folks for that for 98 00:03:26,550 --> 00:03:25,280 uh helping us with that 99 00:03:27,750 --> 00:03:26,560 and so first i'm going to talk about the 100 00:03:29,670 --> 00:03:27,760 crew a little bit and then i'm going to 101 00:03:33,110 --> 00:03:29,680 go into the russian segment eva so i 102 00:03:35,910 --> 00:03:33,120 could have the first graphic 103 00:03:38,309 --> 00:03:35,920 all right so on the left is akihiko 104 00:03:40,550 --> 00:03:38,319 hoshide and we call him aki 105 00:03:42,229 --> 00:03:40,560 and to his right is yuri malenchenko 106 00:03:43,830 --> 00:03:42,239 next to him is sunita williams and we 107 00:03:46,550 --> 00:03:43,840 call her sunny 108 00:03:48,789 --> 00:03:46,560 those three arrived in mid-july 109 00:03:50,390 --> 00:03:48,799 and next to sunny you see joe acaba who 110 00:03:51,750 --> 00:03:50,400 is currently leading the u.s portion of 111 00:03:53,830 --> 00:03:51,760 station 112 00:03:56,550 --> 00:03:53,840 followed by the iss commander gennady 113 00:03:57,670 --> 00:03:56,560 padalka and then sergei revin 114 00:03:59,190 --> 00:03:57,680 and four of those six are going to be 115 00:04:01,190 --> 00:03:59,200 performing spacewalks in the next couple 116 00:04:03,990 --> 00:04:01,200 of weeks gennady and uri will perform 117 00:04:06,309 --> 00:04:04,000 the russian spacewalk on august 20th 118 00:04:09,190 --> 00:04:06,319 and sunny and aki will perform the u.s 119 00:04:11,830 --> 00:04:09,200 spacewalk on august 30th 120 00:04:13,990 --> 00:04:11,840 so the next graphic please 121 00:04:16,310 --> 00:04:14,000 the russian segment eva will be in orlon 122 00:04:19,030 --> 00:04:16,320 space suits out of the piers module 123 00:04:21,509 --> 00:04:19,040 with egress happening monday at 9 40 a.m 124 00:04:24,310 --> 00:04:21,519 houston local time 125 00:04:27,189 --> 00:04:24,320 gennady will be ev-1 with a red stripe 126 00:04:28,629 --> 00:04:27,199 and he'll have the helmet camera on 127 00:04:30,150 --> 00:04:28,639 he's previously conducted eight 128 00:04:32,390 --> 00:04:30,160 spacewalks 129 00:04:34,150 --> 00:04:32,400 six on iss and two on the mir space 130 00:04:36,150 --> 00:04:34,160 station 131 00:04:37,510 --> 00:04:36,160 yuri will be ev2 with a blue stripe on 132 00:04:40,390 --> 00:04:37,520 his suit 133 00:04:43,270 --> 00:04:40,400 and he's performed four evas in the past 134 00:04:44,390 --> 00:04:43,280 one on sts-106 as well as another iss 135 00:04:51,909 --> 00:04:44,400 eva 136 00:04:53,590 --> 00:04:51,919 there's three main tasks and three get 137 00:04:55,430 --> 00:04:53,600 ahead tasks 138 00:04:56,710 --> 00:04:55,440 the crew will relocate a strela crane to 139 00:04:57,990 --> 00:04:56,720 move it off the docking compartment 140 00:04:59,909 --> 00:04:58,000 piers 141 00:05:01,430 --> 00:04:59,919 and over to the forward end of the zara 142 00:05:04,390 --> 00:05:01,440 module 143 00:05:07,270 --> 00:05:04,400 with the russian multipurpose logistics 144 00:05:10,310 --> 00:05:07,280 module nuaka when it comes up in 2013 145 00:05:12,150 --> 00:05:10,320 so that crane needs to move 146 00:05:14,310 --> 00:05:12,160 they'll also release a passive spherical 147 00:05:15,110 --> 00:05:14,320 satellite pronounced sphera or also 148 00:05:16,310 --> 00:05:15,120 called 149 00:05:17,590 --> 00:05:16,320 t vector 150 00:05:19,270 --> 00:05:17,600 that will allow our russian colleagues 151 00:05:22,469 --> 00:05:19,280 to evaluate ground station tracking and 152 00:05:24,790 --> 00:05:22,479 modeling for orbital debris 153 00:05:26,469 --> 00:05:24,800 the crew will install five micrometer 154 00:05:29,590 --> 00:05:26,479 orbital debris shields on the small 155 00:05:31,670 --> 00:05:29,600 diameter of the zvezda module 156 00:05:33,909 --> 00:05:31,680 and then as get aheads 157 00:05:34,950 --> 00:05:33,919 we've got three of those time permitting 158 00:05:36,950 --> 00:05:34,960 there's two 159 00:05:38,710 --> 00:05:36,960 external experiments 160 00:05:40,310 --> 00:05:38,720 and also there's an installation of some 161 00:05:41,510 --> 00:05:40,320 support struts for the eva ladder to 162 00:05:43,270 --> 00:05:41,520 make it more 163 00:05:45,270 --> 00:05:43,280 stable 164 00:05:47,350 --> 00:05:45,280 the expected eba duration is 6 hours and 165 00:05:49,029 --> 00:05:47,360 25 minutes 166 00:05:51,270 --> 00:05:49,039 and joe and sergey will be in the poisk 167 00:05:52,870 --> 00:05:51,280 module near their soyuz for the eva 168 00:05:58,390 --> 00:05:52,880 while sunny and aki will have access to 169 00:06:03,510 --> 00:06:00,390 next to next you'll see a video of the 170 00:06:06,950 --> 00:06:05,430 this is the aft in the station with the 171 00:06:08,550 --> 00:06:06,960 russian modules surrounding the piers 172 00:06:10,550 --> 00:06:08,560 airlock 173 00:06:12,390 --> 00:06:10,560 the hatch opens and you'll see yuri and 174 00:06:14,550 --> 00:06:12,400 then gennady egressing onto the eva 175 00:06:16,230 --> 00:06:14,560 ladder 176 00:06:17,909 --> 00:06:16,240 now looking from above you'll see 177 00:06:18,950 --> 00:06:17,919 gennady adjusting the strela 2 foot 178 00:06:21,430 --> 00:06:18,960 restraint 179 00:06:23,270 --> 00:06:21,440 and yuri on the tip of the strella boom 180 00:06:26,790 --> 00:06:23,280 riding it up to the other strela on the 181 00:06:28,309 --> 00:06:26,800 zenith part of iss on poisk 182 00:06:30,629 --> 00:06:28,319 the strela that's in motion is the one 183 00:06:32,870 --> 00:06:30,639 that will move over to zarya so 184 00:06:39,670 --> 00:06:32,880 gennady then retracts it as you see here 185 00:06:43,270 --> 00:06:41,510 zooming in on gennady you can see him 186 00:06:44,550 --> 00:06:43,280 here he's positioning a 187 00:06:46,830 --> 00:06:44,560 an attached foot restraint for the 188 00:06:49,510 --> 00:06:46,840 relocation and 189 00:06:51,430 --> 00:06:49,520 stowage at the top of the screen you'll 190 00:06:54,309 --> 00:06:51,440 see yuri adjusting his foot restraint so 191 00:06:57,189 --> 00:06:54,319 he can position the strela on poisk 192 00:06:59,270 --> 00:06:57,199 for its extension down to gennady 193 00:07:00,950 --> 00:06:59,280 so here's the positioning 194 00:07:02,230 --> 00:07:00,960 and now he's extending that upper strela 195 00:07:05,909 --> 00:07:02,240 down to gennady's work site for the 196 00:07:11,029 --> 00:07:07,589 the flashing area points out where the 197 00:07:14,790 --> 00:07:12,870 next you'll see yuri making his way down 198 00:07:16,790 --> 00:07:14,800 the upper strela boom 199 00:07:19,670 --> 00:07:16,800 to assist gennady in releasing strela 2 200 00:07:21,350 --> 00:07:19,680 from its mounting location on piers 201 00:07:24,629 --> 00:07:21,360 and they work together to get it into a 202 00:07:26,710 --> 00:07:24,639 good position for the relocation 203 00:07:29,510 --> 00:07:26,720 here they're rotating strela 2 so it's 204 00:07:31,189 --> 00:07:29,520 in line with strela 1 205 00:07:33,029 --> 00:07:31,199 and that'll make it a more compact 206 00:07:37,189 --> 00:07:33,039 package on the end of the boom for the 207 00:07:40,790 --> 00:07:38,870 so after everything squared away yuri 208 00:07:42,550 --> 00:07:40,800 translates up up to the base of the 209 00:07:44,070 --> 00:07:42,560 upper strela so that he can manipulate 210 00:07:52,710 --> 00:07:44,080 the stroller mechanisms and begin the 211 00:07:58,469 --> 00:07:55,589 so gennady gets a really fantastic view 212 00:08:00,070 --> 00:07:58,479 as yuri pitches strela up 213 00:08:02,150 --> 00:08:00,080 and he also positions strela two by 214 00:08:03,830 --> 00:08:02,160 spinning it around 215 00:08:07,510 --> 00:08:03,840 and then he turns the entire strela to 216 00:08:11,029 --> 00:08:09,510 now you can see the move over to the 217 00:08:13,110 --> 00:08:11,039 forward end of zarya followed by an 218 00:08:14,710 --> 00:08:13,120 extension of the boom 219 00:08:20,230 --> 00:08:14,720 yuri is just using hand cranks to 220 00:08:23,510 --> 00:08:22,150 so yuri then translates forward on iss 221 00:08:25,510 --> 00:08:23,520 down the stroller to meet up with 222 00:08:28,309 --> 00:08:25,520 gennady and help with the removal of 223 00:08:30,150 --> 00:08:28,319 strela 2 and its installation 224 00:08:32,070 --> 00:08:30,160 and so after some manipulation they work 225 00:08:36,790 --> 00:08:32,080 together to install it onto an adapter 226 00:08:42,389 --> 00:08:38,709 yuri gets a short ride for the pitch 227 00:08:47,190 --> 00:08:44,550 and here you see him making his way 228 00:08:49,110 --> 00:08:47,200 aft on iss 229 00:08:51,030 --> 00:08:49,120 translating on strela 230 00:08:55,670 --> 00:08:51,040 and back to poisk so he can drive strela 231 00:08:58,710 --> 00:08:56,949 now that the work is done on zarya 232 00:09:00,710 --> 00:08:58,720 gennady hops on the end for his ride 233 00:09:04,470 --> 00:09:00,720 back 234 00:09:06,710 --> 00:09:04,480 and once again he'll get an amazing view 235 00:09:09,030 --> 00:09:06,720 strela is going to maneuver him 236 00:09:11,670 --> 00:09:09,040 back down to piers and this strella will 237 00:09:13,430 --> 00:09:11,680 manix will remain extended 238 00:09:17,350 --> 00:09:13,440 between poisk and piers at the end of 239 00:09:22,230 --> 00:09:20,630 so here's the attachment area 240 00:09:24,150 --> 00:09:22,240 and at this point gennady also has the 241 00:09:27,910 --> 00:09:24,160 opportunity to grab the first external 242 00:09:29,910 --> 00:09:27,920 experiment s kaka you see it flashing 243 00:09:32,150 --> 00:09:29,920 esca cause a materials experiment that 244 00:09:34,630 --> 00:09:32,160 allows for exposing multiple 245 00:09:36,870 --> 00:09:34,640 materials to space and it closes up like 246 00:09:38,870 --> 00:09:36,880 a small briefcase and it's brought 247 00:09:40,790 --> 00:09:38,880 inside 248 00:09:44,949 --> 00:09:40,800 so here you see it flashing and folding 249 00:09:47,670 --> 00:09:46,150 so gennady and yuri are going to make 250 00:09:49,829 --> 00:09:47,680 their way back to the eva ladder on 251 00:09:53,030 --> 00:09:49,839 piers to deploy the spherical satellite 252 00:09:54,550 --> 00:09:53,040 and here you see it flashing 253 00:09:56,310 --> 00:09:54,560 the satellite's about 21 inches in 254 00:09:59,030 --> 00:09:56,320 diameter it has a mass of about 20 255 00:10:00,389 --> 00:09:59,040 pounds it's completely passive 256 00:10:03,190 --> 00:10:00,399 in the right hand photo you see two 257 00:10:05,030 --> 00:10:03,200 items there's a mock-up of the sphere 258 00:10:06,790 --> 00:10:05,040 and also a tool to the right that holds 259 00:10:09,590 --> 00:10:06,800 the sphere while the crew egresses the 260 00:10:11,990 --> 00:10:09,600 airlock and gets into position 261 00:10:14,069 --> 00:10:12,000 before deploy the crew releases a strap 262 00:10:15,430 --> 00:10:14,079 on the tool so that just the fingers are 263 00:10:17,829 --> 00:10:15,440 gripping it 264 00:10:20,710 --> 00:10:17,839 and then they give the tool a push to 265 00:10:24,310 --> 00:10:22,710 it's deployed in the af nadir direction 266 00:10:28,630 --> 00:10:24,320 and it's expected to stay on orbit for 267 00:10:32,069 --> 00:10:30,470 next you see gennady and yuri retrieving 268 00:10:35,829 --> 00:10:32,079 the debris shields from the airlock in 269 00:10:39,590 --> 00:10:37,910 here you can see the installation sites 270 00:10:41,829 --> 00:10:39,600 on this graphic 271 00:10:43,269 --> 00:10:41,839 there's a total of five shields 272 00:10:45,030 --> 00:10:43,279 they're bundled in a package of three 273 00:10:46,710 --> 00:10:45,040 and a package of two 274 00:10:48,550 --> 00:10:46,720 the bundles get separated and the 275 00:10:50,230 --> 00:10:48,560 shields attached to the handrails on the 276 00:10:53,110 --> 00:10:50,240 small diameter compartment of the of 277 00:10:58,389 --> 00:10:54,790 so in this video you can see the three 278 00:11:00,069 --> 00:10:58,399 port side shield installation sites 279 00:11:02,230 --> 00:11:00,079 these shields are similar in design as 280 00:11:05,030 --> 00:11:02,240 what we've previously installed on on 281 00:11:06,630 --> 00:11:05,040 past evas 282 00:11:07,910 --> 00:11:06,640 so next you can see the second external 283 00:11:10,710 --> 00:11:07,920 experiment that the crew may bring 284 00:11:12,870 --> 00:11:10,720 inside if they have time 285 00:11:14,150 --> 00:11:12,880 this is called biorisk and it has 286 00:11:16,310 --> 00:11:14,160 experiments inside that have been 287 00:11:17,990 --> 00:11:16,320 exposed to space 288 00:11:19,430 --> 00:11:18,000 this is a photo of the pierce module on 289 00:11:23,190 --> 00:11:19,440 the right with a close-up view showing 290 00:11:26,389 --> 00:11:24,790 here you see a get ahead to install two 291 00:11:28,790 --> 00:11:26,399 struts on the eva ladder which should 292 00:11:30,230 --> 00:11:28,800 help for stability and this equipment 293 00:11:32,310 --> 00:11:30,240 will later move to the new airlock on 294 00:11:34,150 --> 00:11:32,320 nuwaka 295 00:11:38,870 --> 00:11:34,160 after that gennady and yuri will ingress 296 00:11:41,269 --> 00:11:40,470 so only one thing i wanted to add here 297 00:11:44,470 --> 00:11:41,279 is that 298 00:11:46,630 --> 00:11:44,480 for the lead iss flight director for the 299 00:11:49,430 --> 00:11:46,640 russian segment eva that will be jerry 300 00:11:51,030 --> 00:11:49,440 jason and for the u.s eva that will be 301 00:11:52,310 --> 00:11:51,040 advance ice 302 00:11:56,069 --> 00:11:52,320 and so with that i'll pass it over to 303 00:11:57,829 --> 00:11:56,079 keith johnson he'll describe us eva 18. 304 00:12:00,949 --> 00:11:57,839 thank you dina 305 00:12:03,269 --> 00:12:00,959 well let's see this is uh the first usa 306 00:12:06,069 --> 00:12:03,279 in over a year the last dva that was 307 00:12:07,350 --> 00:12:06,079 performed on space station by the u.s 308 00:12:09,750 --> 00:12:07,360 team 309 00:12:11,990 --> 00:12:09,760 was by mike fossum and ron guerin during 310 00:12:14,230 --> 00:12:12,000 the sts-135 mission 311 00:12:16,710 --> 00:12:14,240 back in july 312 00:12:18,230 --> 00:12:16,720 our first slide we have pictures of our 313 00:12:20,230 --> 00:12:18,240 ev crew members 314 00:12:24,069 --> 00:12:20,240 we've already mentioned that 315 00:12:26,790 --> 00:12:24,079 sonny williams is ev1 on the cba she'll 316 00:12:29,190 --> 00:12:26,800 have the red stripes on her suit this is 317 00:12:30,310 --> 00:12:29,200 will be her fifth eva she's done four so 318 00:12:33,430 --> 00:12:30,320 far 319 00:12:36,550 --> 00:12:33,440 during expedition 14 and 15 totaling 320 00:12:38,389 --> 00:12:36,560 about 29 hours and 17 minutes of 321 00:12:39,110 --> 00:12:38,399 spacewalk time so she'll be adding to 322 00:12:40,790 --> 00:12:39,120 that 323 00:12:42,389 --> 00:12:40,800 our ev2 324 00:12:43,829 --> 00:12:42,399 for the upcoming eva 325 00:12:46,949 --> 00:12:43,839 is aki 326 00:12:48,470 --> 00:12:46,959 hoshida we call him aki and this is his 327 00:12:51,750 --> 00:12:48,480 first spacewalk 328 00:12:54,870 --> 00:12:51,760 he will be the third japanese astronaut 329 00:12:57,910 --> 00:12:54,880 to do a space walk following takao doi 330 00:12:59,670 --> 00:12:57,920 and suichi naguchi 331 00:13:02,150 --> 00:12:59,680 so let's see 332 00:13:05,509 --> 00:13:02,160 joe acaba is the 333 00:13:07,110 --> 00:13:05,519 ivy or the arm operator for the eva aki 334 00:13:09,670 --> 00:13:07,120 will be on the arm for the majority of 335 00:13:12,550 --> 00:13:09,680 the eba and then we have a ground-based 336 00:13:14,870 --> 00:13:12,560 iv crew member which is jack fischer and 337 00:13:16,470 --> 00:13:14,880 he's not done an eb eva before but he's 338 00:13:18,389 --> 00:13:16,480 helping out with the development of the 339 00:13:20,790 --> 00:13:18,399 eva 340 00:13:23,110 --> 00:13:20,800 i've got a slide that shows our list of 341 00:13:26,150 --> 00:13:23,120 tasks the first thing we're doing on the 342 00:13:28,310 --> 00:13:26,160 eva and the main reason for going eva is 343 00:13:30,710 --> 00:13:28,320 the main bus switching unit number one 344 00:13:33,269 --> 00:13:30,720 removal and replacement this particular 345 00:13:34,629 --> 00:13:33,279 box has failed in such a way that it's 346 00:13:37,110 --> 00:13:34,639 passing power 347 00:13:39,269 --> 00:13:37,120 but it can no longer be switched and in 348 00:13:41,030 --> 00:13:39,279 order to do future operations we need to 349 00:13:43,189 --> 00:13:41,040 take that box out and put one in that 350 00:13:45,189 --> 00:13:43,199 allows us to do that 351 00:13:47,110 --> 00:13:45,199 another task that we're doing on the eva 352 00:13:50,150 --> 00:13:47,120 is cable routing 353 00:13:52,230 --> 00:13:50,160 two primary and redundant power cables 354 00:13:53,350 --> 00:13:52,240 to the russian multi-purpose laboratory 355 00:13:55,509 --> 00:13:53,360 module 356 00:13:57,750 --> 00:13:55,519 that dina referred to 357 00:13:59,350 --> 00:13:57,760 we started on the u.s segment and run it 358 00:14:01,189 --> 00:13:59,360 over to the interface between the 359 00:14:02,870 --> 00:14:01,199 russian and u.s segment and then the 360 00:14:05,829 --> 00:14:02,880 russians will later on 361 00:14:09,590 --> 00:14:05,839 run their half of that cabling 362 00:14:12,230 --> 00:14:09,600 and just recently we had a failure of 363 00:14:14,230 --> 00:14:12,240 one of the cameras on the ssrms the the 364 00:14:15,829 --> 00:14:14,240 boom b camera 365 00:14:17,829 --> 00:14:15,839 this morning we had meetings with 366 00:14:19,670 --> 00:14:17,839 management and we decided that this is 367 00:14:21,430 --> 00:14:19,680 the next highest priority 368 00:14:24,629 --> 00:14:21,440 so that camera will be removed and 369 00:14:25,990 --> 00:14:24,639 replaced as our get-aheads and time 370 00:14:27,829 --> 00:14:26,000 permitting 371 00:14:29,750 --> 00:14:27,839 the next task we have is a protective 372 00:14:31,590 --> 00:14:29,760 cover installation on the pressurized 373 00:14:33,430 --> 00:14:31,600 mating adapter too 374 00:14:35,430 --> 00:14:33,440 which is at the forward end of station 375 00:14:38,470 --> 00:14:35,440 and we are covering it up so that we 376 00:14:39,670 --> 00:14:38,480 protect against a micro meteoroid debris 377 00:14:42,389 --> 00:14:39,680 and 378 00:14:44,629 --> 00:14:42,399 keep it safe until we fly up a new 379 00:14:46,069 --> 00:14:44,639 docking system that's coming up and then 380 00:14:48,389 --> 00:14:46,079 we'll take that cover off and install 381 00:14:50,150 --> 00:14:48,399 that in the future 382 00:14:52,550 --> 00:14:50,160 we do have other camera problems that 383 00:14:55,030 --> 00:14:52,560 we're looking at one of them is on the 384 00:14:57,829 --> 00:14:55,040 the mobile based system the mast camera 385 00:14:59,750 --> 00:14:57,839 and we in order to bring that home we 386 00:15:01,030 --> 00:14:59,760 will be removing that camera bringing it 387 00:15:03,750 --> 00:15:01,040 inside 388 00:15:05,990 --> 00:15:03,760 also there is a camera problem on the 389 00:15:08,389 --> 00:15:06,000 kibo exposed facility 390 00:15:09,990 --> 00:15:08,399 and we will be taking as a get ahead 391 00:15:11,110 --> 00:15:10,000 removing and replacing that if time 392 00:15:12,870 --> 00:15:11,120 permits 393 00:15:13,590 --> 00:15:12,880 and finally 394 00:15:17,110 --> 00:15:13,600 the 395 00:15:18,949 --> 00:15:17,120 pdgf 396 00:15:20,710 --> 00:15:18,959 has a potential for another 397 00:15:22,550 --> 00:15:20,720 wire that is 398 00:15:26,470 --> 00:15:22,560 may cause problems and we may send the 399 00:15:28,870 --> 00:15:26,480 crew over to to pull that debris out 400 00:15:30,310 --> 00:15:28,880 so i've got a graphic that shows uh some 401 00:15:31,430 --> 00:15:30,320 footage of 402 00:15:34,230 --> 00:15:31,440 the uh 403 00:15:37,670 --> 00:15:34,240 the eva as we have it going 404 00:15:40,550 --> 00:15:37,680 so if you'll bring up then the next uh 405 00:15:43,430 --> 00:15:40,560 okay so the eva d press starts at about 406 00:15:46,710 --> 00:15:43,440 6 45 central time and with the crew 407 00:15:48,389 --> 00:15:46,720 coming out the hatch at about 7 15 a.m 408 00:15:50,310 --> 00:15:48,399 sunny williams is ev-1 she'll be the 409 00:15:51,670 --> 00:15:50,320 first one out of the hatch followed by 410 00:15:52,710 --> 00:15:51,680 uh 411 00:15:57,749 --> 00:15:52,720 aki 412 00:15:59,269 --> 00:15:57,759 sonny's first task is to hook up what we 413 00:15:59,990 --> 00:15:59,279 call a fish stringer which is a tether 414 00:16:02,310 --> 00:16:00,000 with 415 00:16:04,389 --> 00:16:02,320 many hooks on it and she'll attach bags 416 00:16:06,870 --> 00:16:04,399 and tools to that 417 00:16:08,949 --> 00:16:06,880 to in preparation for the eva kind of a 418 00:16:12,310 --> 00:16:08,959 staging ground after she's done with 419 00:16:16,790 --> 00:16:12,320 that she'll rotate around to face the 420 00:16:21,990 --> 00:16:19,430 which is where we have the spare 421 00:16:22,790 --> 00:16:22,000 main bus switching unit in preparation 422 00:16:24,790 --> 00:16:22,800 for 423 00:16:27,030 --> 00:16:24,800 stowing the failed unit we install 424 00:16:29,910 --> 00:16:27,040 what's called a multi-use tether end 425 00:16:31,350 --> 00:16:29,920 effector ball stack multi-use end 426 00:16:33,269 --> 00:16:31,360 effector it's kind of a grapple on one 427 00:16:35,350 --> 00:16:33,279 end grapple on the other i'll refer to 428 00:16:38,870 --> 00:16:35,360 that as the ball stack from here on out 429 00:16:44,069 --> 00:16:41,670 after she's done with that she'll remove 430 00:16:45,430 --> 00:16:44,079 straps on multi-layer insulation that's 431 00:16:47,430 --> 00:16:45,440 protecting 432 00:16:49,350 --> 00:16:47,440 the main bus switching unit 433 00:16:51,749 --> 00:16:49,360 as it's attached to a flight releasable 434 00:16:53,910 --> 00:16:51,759 attachment mechanism she undoes velcro 435 00:16:55,430 --> 00:16:53,920 straps peels that back gets it out of 436 00:16:58,790 --> 00:16:55,440 the way 437 00:17:00,550 --> 00:16:58,800 to expose the main bus switching unit 438 00:17:03,110 --> 00:17:00,560 she'll put a torque multiplier on the 439 00:17:05,270 --> 00:17:03,120 two bolts that hold this onto the fram 440 00:17:08,309 --> 00:17:05,280 and when she breaks the torque on those 441 00:17:11,590 --> 00:17:08,319 she'll install what we call a scoop 442 00:17:13,110 --> 00:17:11,600 which is a handling aid that allows aki 443 00:17:15,110 --> 00:17:13,120 to pull this out when he removes it 444 00:17:16,710 --> 00:17:15,120 later on in the eva 445 00:17:19,909 --> 00:17:16,720 once that's done 446 00:17:22,789 --> 00:17:19,919 sunny will turn around she'll grab a 447 00:17:26,710 --> 00:17:22,799 bundle of cable which is the the mlm 448 00:17:29,909 --> 00:17:26,720 power cable and she'll translate up to 449 00:17:33,590 --> 00:17:29,919 the lab node one interface and hook up 450 00:17:35,909 --> 00:17:33,600 one end of that cable to another cable 451 00:17:38,630 --> 00:17:35,919 and start routing that aft and you can 452 00:17:40,630 --> 00:17:38,640 see that highlighted in the in the video 453 00:17:42,549 --> 00:17:40,640 she'll temporarily stow it attached to 454 00:17:43,510 --> 00:17:42,559 one of the the handrails in the lower 455 00:17:45,750 --> 00:17:43,520 left 456 00:17:48,789 --> 00:17:45,760 and meanwhile aki will be doing a 457 00:17:51,270 --> 00:17:48,799 translation adaptation he'll take a bag 458 00:17:53,909 --> 00:17:51,280 with tools in it he'll translate 459 00:17:55,750 --> 00:17:53,919 up to the s0 truss 460 00:17:58,630 --> 00:17:55,760 phase 2 of the s0 truss you'll see a 461 00:18:00,950 --> 00:17:58,640 hand rail flashing in the graphic he'll 462 00:18:03,350 --> 00:18:00,960 attach his tools in the bag 463 00:18:06,230 --> 00:18:03,360 to that handrail and then he'll go over 464 00:18:07,830 --> 00:18:06,240 and he'll break torque on the failed 465 00:18:10,390 --> 00:18:07,840 main bus switching unit that you see 466 00:18:11,909 --> 00:18:10,400 over there to the left after those 467 00:18:13,990 --> 00:18:11,919 the torque is broken on both of those 468 00:18:16,070 --> 00:18:14,000 he'll install scoops which will provide 469 00:18:18,470 --> 00:18:16,080 him with a handling aid 470 00:18:21,190 --> 00:18:18,480 to therefore install an articulating 471 00:18:23,830 --> 00:18:21,200 portable foot restraint on the arm 472 00:18:25,029 --> 00:18:23,840 and then from there he will ingress the 473 00:18:26,150 --> 00:18:25,039 arm 474 00:18:33,110 --> 00:18:26,160 and 475 00:18:35,270 --> 00:18:33,120 power down up test on this box to see if 476 00:18:37,669 --> 00:18:35,280 it comes back to life um just to get 477 00:18:39,430 --> 00:18:37,679 kind of a science experiment on it um 478 00:18:41,590 --> 00:18:39,440 once that's done they'll power it down 479 00:18:44,549 --> 00:18:41,600 he'll drive the bolts and from there 480 00:18:46,390 --> 00:18:44,559 he'll back away with the mbsu 481 00:18:49,190 --> 00:18:46,400 and he'll start on 482 00:18:51,830 --> 00:18:49,200 what we call a joint automated or 483 00:18:53,430 --> 00:18:51,840 operator commanded automated sequence or 484 00:18:55,750 --> 00:18:53,440 joe caz 485 00:18:58,070 --> 00:18:55,760 which is a pre-programmed arm 486 00:18:59,669 --> 00:18:58,080 translation to head him back down 487 00:19:02,549 --> 00:18:59,679 in the meantime 488 00:19:04,630 --> 00:19:02,559 sunny is going to take the other cable 489 00:19:07,909 --> 00:19:04,640 and go towards the interface between the 490 00:19:11,110 --> 00:19:07,919 russian and the u.s segment and attach 491 00:19:12,230 --> 00:19:11,120 the second cable for the mlm to a 492 00:19:14,230 --> 00:19:12,240 handrail 493 00:19:16,150 --> 00:19:14,240 and from there she starts unwinding it 494 00:19:19,750 --> 00:19:16,160 and making her way 495 00:19:21,909 --> 00:19:19,760 nader on space station around the pma 496 00:19:24,390 --> 00:19:21,919 she'll feed it underneath and then she 497 00:19:25,590 --> 00:19:24,400 has to go and move the u.s crane out of 498 00:19:29,669 --> 00:19:25,600 the way 499 00:19:32,150 --> 00:19:29,679 translation path so she'll get up and 500 00:19:34,230 --> 00:19:32,160 she'll do some manual maneuvering 501 00:19:36,710 --> 00:19:34,240 to get that out of the way then she 502 00:19:38,710 --> 00:19:36,720 heads back around and continues routing 503 00:19:39,909 --> 00:19:38,720 along node 1 504 00:19:41,990 --> 00:19:39,919 forward 505 00:19:44,470 --> 00:19:42,000 to the s0 truss and you'll see that 506 00:19:45,430 --> 00:19:44,480 blink on the graphic here she feeds it 507 00:19:49,590 --> 00:19:45,440 into 508 00:19:51,190 --> 00:19:49,600 the interior of the s0 truss 509 00:19:53,590 --> 00:19:51,200 at that point 510 00:19:54,310 --> 00:19:53,600 roughly aki will have made his way down 511 00:19:58,950 --> 00:19:54,320 to 512 00:20:01,990 --> 00:19:58,960 take the failed mbsu that he just 513 00:20:03,669 --> 00:20:02,000 removed and he'll temporarily stow it on 514 00:20:04,789 --> 00:20:03,679 the mud end effector that i pointed out 515 00:20:07,510 --> 00:20:04,799 before 516 00:20:08,630 --> 00:20:07,520 from there he'll maneuver into 517 00:20:10,789 --> 00:20:08,640 the spare 518 00:20:13,510 --> 00:20:10,799 mane by switching unit he'll drive the 519 00:20:16,549 --> 00:20:13,520 two bolts lift it out 520 00:20:19,669 --> 00:20:16,559 he'll ground call the arm back away from 521 00:20:24,149 --> 00:20:22,230 and then the arm will continue motion 522 00:20:28,149 --> 00:20:24,159 and he'll start another joe caz from 523 00:20:29,590 --> 00:20:28,159 this position back up for installation 524 00:20:32,950 --> 00:20:29,600 meanwhile 525 00:20:34,710 --> 00:20:32,960 sunny will be working on the s0 truss 526 00:20:37,430 --> 00:20:34,720 the next fun thing that she gets to do 527 00:20:41,510 --> 00:20:37,440 is pull back some mli that's on phase 528 00:20:44,149 --> 00:20:41,520 three of s0 it opens up a location where 529 00:20:46,230 --> 00:20:44,159 she can climb inside the truss 530 00:20:47,750 --> 00:20:46,240 and you can see the mli peeled out of 531 00:20:49,990 --> 00:20:47,760 the way in the opening that she gets to 532 00:20:51,990 --> 00:20:50,000 go inside next you see the graphic of 533 00:20:54,789 --> 00:20:52,000 her inside taking the cable bundle 534 00:20:57,430 --> 00:20:54,799 routing along some interior handrails 535 00:20:58,549 --> 00:20:57,440 and that comes over to a panel that's up 536 00:21:00,630 --> 00:20:58,559 inside 537 00:21:03,029 --> 00:21:00,640 you'll see the connector flashing 538 00:21:04,950 --> 00:21:03,039 she gets herself into position 539 00:21:07,430 --> 00:21:04,960 this was launched with some strings 540 00:21:09,190 --> 00:21:07,440 holding the bails in place you can see 541 00:21:10,710 --> 00:21:09,200 those three white strings she will cut 542 00:21:12,710 --> 00:21:10,720 those with scissors 543 00:21:15,430 --> 00:21:12,720 throw the bail in the center take that 544 00:21:16,789 --> 00:21:15,440 cap off and then connect the cable at 545 00:21:18,549 --> 00:21:16,799 that point 546 00:21:20,070 --> 00:21:18,559 when she's done with that she'll clean 547 00:21:21,669 --> 00:21:20,080 up the work site cover the mli and then 548 00:21:24,470 --> 00:21:21,679 she'll go over and provide a set of eyes 549 00:21:27,110 --> 00:21:24,480 for aki installing the spare main bus 550 00:21:29,430 --> 00:21:27,120 switching unit onto the s0 truss 551 00:21:30,870 --> 00:21:29,440 he puts that into position and he drives 552 00:21:32,950 --> 00:21:30,880 the two bolts 553 00:21:35,350 --> 00:21:32,960 and then sonny gets to leave and go do 554 00:21:37,110 --> 00:21:35,360 other work while he uh cleans up the 555 00:21:39,029 --> 00:21:37,120 work site 556 00:21:41,830 --> 00:21:39,039 one of the get-aheads that we have for a 557 00:21:45,590 --> 00:21:41,840 task if we're ahead is the 558 00:21:48,149 --> 00:21:45,600 the mbs mass camera will have aki fly up 559 00:21:49,750 --> 00:21:48,159 to that position it's a single bolt to 560 00:21:52,310 --> 00:21:49,760 remove that camera 561 00:21:54,549 --> 00:21:52,320 based on our recent priority change 562 00:21:56,149 --> 00:21:54,559 he'll just take that camera off and 563 00:21:58,310 --> 00:21:56,159 bring it back with him he won't install 564 00:22:00,870 --> 00:21:58,320 another camera in place of that then the 565 00:22:03,270 --> 00:22:00,880 arm will maneuver him back to the mbsu 566 00:22:05,909 --> 00:22:03,280 that has the scoops on it and he'll use 567 00:22:07,590 --> 00:22:05,919 that to egress the arm 568 00:22:09,110 --> 00:22:07,600 you'll see that down to the lower left 569 00:22:09,990 --> 00:22:09,120 you can see sunny 570 00:22:11,750 --> 00:22:10,000 at the 571 00:22:13,990 --> 00:22:11,760 failed mbsu sitting on the mutt ball 572 00:22:15,750 --> 00:22:14,000 stack she'll take that and she'll swing 573 00:22:18,230 --> 00:22:15,760 it around and install it back on the 574 00:22:20,470 --> 00:22:18,240 fram she'll drive the bolts 575 00:22:22,789 --> 00:22:20,480 take the scoops off 576 00:22:24,630 --> 00:22:22,799 clean up the mud end effector 577 00:22:26,789 --> 00:22:24,640 and then reinstall the multi-layer 578 00:22:28,789 --> 00:22:26,799 install insulation and that's 579 00:22:31,430 --> 00:22:28,799 ready to sit there until it's it has 580 00:22:33,510 --> 00:22:31,440 finds another use meanwhile aki is 581 00:22:35,190 --> 00:22:33,520 removing the articulating portable foot 582 00:22:37,110 --> 00:22:35,200 restraint 583 00:22:39,750 --> 00:22:37,120 and he'll reposition that into a 584 00:22:42,070 --> 00:22:39,760 worksite interface at this work site 585 00:22:43,909 --> 00:22:42,080 the arm will reposition and provide him 586 00:22:46,950 --> 00:22:43,919 with access to 587 00:22:49,110 --> 00:22:46,960 the boom camera you see highlighted here 588 00:22:50,390 --> 00:22:49,120 he will remove this camera and replace 589 00:22:52,390 --> 00:22:50,400 it with a spare that we will have 590 00:22:55,510 --> 00:22:52,400 brought out with us at the start of the 591 00:23:00,630 --> 00:22:58,310 and then as time permits 592 00:23:03,270 --> 00:23:00,640 he and sunny will translate out to the 593 00:23:05,669 --> 00:23:03,280 forward end of the space station 594 00:23:07,270 --> 00:23:05,679 and install the pressurized mating 595 00:23:08,630 --> 00:23:07,280 adapter 596 00:23:11,750 --> 00:23:08,640 ii cover 597 00:23:13,510 --> 00:23:11,760 it's just a multi-layer insulation 598 00:23:15,909 --> 00:23:13,520 that has some kevlar fiber in it that 599 00:23:18,390 --> 00:23:15,919 will protect those surfaces from micro 600 00:23:19,990 --> 00:23:18,400 meteoroid debris and they'll strap that 601 00:23:21,190 --> 00:23:20,000 to handrails that you see highlighted in 602 00:23:22,870 --> 00:23:21,200 the graphic 603 00:23:25,350 --> 00:23:22,880 when they're done with that 604 00:23:28,070 --> 00:23:25,360 again depending on time permitting 605 00:23:31,830 --> 00:23:28,080 they may be able to head over to 606 00:23:33,029 --> 00:23:31,840 kibo and the exposed facility 607 00:23:35,590 --> 00:23:33,039 and 608 00:23:38,710 --> 00:23:35,600 the forward camera on there has no 609 00:23:40,470 --> 00:23:38,720 lights on it and so as i get ahead they 610 00:23:43,029 --> 00:23:40,480 may be able to remove that camera and 611 00:23:44,789 --> 00:23:43,039 replace it with a spare 612 00:23:47,190 --> 00:23:44,799 it's planned for a six and a half hour 613 00:23:49,110 --> 00:23:47,200 eva so at this point they'll clean up 614 00:23:52,470 --> 00:23:49,120 their work sites and head back to the 615 00:23:55,669 --> 00:23:52,480 airlock and thus concludes um what we 616 00:23:57,669 --> 00:23:55,679 hope is a successful eva 617 00:23:59,029 --> 00:23:57,679 okay we'll take some questions now first 618 00:24:00,549 --> 00:23:59,039 uh here in houston then we'll go to the 619 00:24:02,950 --> 00:24:00,559 phone lines let's say we'll start with 620 00:24:04,070 --> 00:24:02,960 gina all right for either for both of 621 00:24:07,269 --> 00:24:04,080 you what do you view is the most 622 00:24:09,269 --> 00:24:07,279 challenging element on each spacewalk 623 00:24:11,029 --> 00:24:09,279 uh well i'll just say the uh on the 624 00:24:13,830 --> 00:24:11,039 russian space walk 625 00:24:15,029 --> 00:24:13,840 probably the smooth of the strela it's a 626 00:24:16,549 --> 00:24:15,039 pretty um 627 00:24:18,870 --> 00:24:16,559 big apparatus it's on the end of an 628 00:24:20,630 --> 00:24:18,880 almost 50-foot boom maneuvering that 629 00:24:22,070 --> 00:24:20,640 around in the past they've had some 630 00:24:24,549 --> 00:24:22,080 trouble where they ran long on this 631 00:24:26,070 --> 00:24:24,559 particular task before or a similar task 632 00:24:27,590 --> 00:24:26,080 of moving a strela 633 00:24:28,870 --> 00:24:27,600 but it wasn't necessarily due to 634 00:24:31,830 --> 00:24:28,880 anything in particular it just kind of 635 00:24:34,149 --> 00:24:31,840 ran long so it could be a timing thing 636 00:24:35,990 --> 00:24:34,159 associated with the strela that um could 637 00:24:37,350 --> 00:24:36,000 allow could cause you know trip them up 638 00:24:39,990 --> 00:24:37,360 a little bit and cause the eba to run 639 00:24:44,149 --> 00:24:41,590 well i would say from 640 00:24:46,390 --> 00:24:44,159 the the usa perspective the crew has 641 00:24:48,390 --> 00:24:46,400 seen this in the water several times so 642 00:24:51,110 --> 00:24:48,400 they've they've got good training 643 00:24:53,909 --> 00:24:51,120 but what ends up happening is um we 644 00:24:55,669 --> 00:24:53,919 change priorities and we change um the 645 00:24:56,950 --> 00:24:55,679 the tasks that that they're being asked 646 00:24:58,310 --> 00:24:56,960 that they looked at in their training a 647 00:24:59,990 --> 00:24:58,320 while ago 648 00:25:03,190 --> 00:25:00,000 but we think that by getting them the 649 00:25:05,750 --> 00:25:03,200 right information and um getting them 650 00:25:07,590 --> 00:25:05,760 talking with them before the eva that 651 00:25:09,669 --> 00:25:07,600 we've minimized that that particular 652 00:25:10,630 --> 00:25:09,679 aspect of of the eva 653 00:25:12,950 --> 00:25:10,640 so 654 00:25:14,710 --> 00:25:12,960 our risks are are similar in that we 655 00:25:17,510 --> 00:25:14,720 want to make sure that we we don't let 656 00:25:19,430 --> 00:25:17,520 the crew run long on a task and we've 657 00:25:21,750 --> 00:25:19,440 timelined it so that we can stop at 658 00:25:24,230 --> 00:25:21,760 various points to get them inside so 659 00:25:26,630 --> 00:25:24,240 we're comfortable with that 660 00:25:28,230 --> 00:25:26,640 there's been concern about gloves and 661 00:25:30,710 --> 00:25:28,240 they've been doing periodic checks on 662 00:25:33,190 --> 00:25:30,720 gloves during spacewalks is that still 663 00:25:36,149 --> 00:25:33,200 an operating procedure 664 00:25:38,470 --> 00:25:36,159 well from uh from the u.s eva yes we um 665 00:25:39,990 --> 00:25:38,480 we timeline glove inspections throughout 666 00:25:42,549 --> 00:25:40,000 the eva 667 00:25:45,110 --> 00:25:42,559 we are concerned we have enhanced the 668 00:25:47,590 --> 00:25:45,120 gloves and made them 669 00:25:48,789 --> 00:25:47,600 better to resist damage that we've seen 670 00:25:51,110 --> 00:25:48,799 in the past 671 00:25:53,190 --> 00:25:51,120 but we still do periodic checks to make 672 00:25:56,070 --> 00:25:53,200 sure that whatever they've been handling 673 00:25:58,310 --> 00:25:56,080 along the way is hasn't caused any 674 00:26:00,710 --> 00:25:58,320 damage to cause them to come inside 675 00:26:02,549 --> 00:26:00,720 um the other aspect of it that the 676 00:26:04,789 --> 00:26:02,559 station's been up there for a long time 677 00:26:06,789 --> 00:26:04,799 um so we have the crew watch where 678 00:26:08,950 --> 00:26:06,799 they're going and make sure that 679 00:26:10,390 --> 00:26:08,960 they don't do anything untoward on their 680 00:26:12,549 --> 00:26:10,400 gloves 681 00:26:13,909 --> 00:26:12,559 thank you okay thanks gina let's go to 682 00:26:15,669 --> 00:26:13,919 the phone lines and take some questions 683 00:26:17,350 --> 00:26:15,679 from there i think that we had denise 684 00:26:18,950 --> 00:26:17,360 ciao i think that we lost one person so 685 00:26:20,149 --> 00:26:18,960 let's see who is uh let's see who's 686 00:26:21,669 --> 00:26:20,159 there 687 00:26:23,029 --> 00:26:21,679 hi 688 00:26:25,909 --> 00:26:23,039 go ahead denise 689 00:26:28,950 --> 00:26:25,919 um just a couple um quick questions for 690 00:26:31,430 --> 00:26:28,960 the the usc va um will the astronauts be 691 00:26:33,269 --> 00:26:31,440 doing the institute light exercise prior 692 00:26:35,029 --> 00:26:33,279 to going out 693 00:26:36,870 --> 00:26:35,039 well that's a good question and and 694 00:26:39,590 --> 00:26:36,880 thank you for asking i i did have that 695 00:26:41,669 --> 00:26:39,600 in my notes and i did men mean to uh to 696 00:26:43,990 --> 00:26:41,679 bring that up yes that is correct and we 697 00:26:47,590 --> 00:26:44,000 will be doing the in-suit light exercise 698 00:26:49,909 --> 00:26:47,600 uh pre-breathe protocol and that is um 699 00:26:52,470 --> 00:26:49,919 currently um with the the ways and 700 00:26:55,029 --> 00:26:52,480 trades the best method for 701 00:26:57,990 --> 00:26:55,039 prolonged oxygen and 702 00:26:59,510 --> 00:26:58,000 it minimizes the the crew activity and 703 00:27:01,750 --> 00:26:59,520 they don't have to sleep out in the in 704 00:27:03,669 --> 00:27:01,760 the airlock so we find that it is the 705 00:27:06,070 --> 00:27:03,679 best protocol and that's what we will be 706 00:27:08,390 --> 00:27:06,080 utilizing 707 00:27:10,950 --> 00:27:08,400 thanks and also um for launching the 708 00:27:12,789 --> 00:27:10,960 sphere satellite um how much of a 709 00:27:14,230 --> 00:27:12,799 priority is that and if the russians 710 00:27:16,390 --> 00:27:14,240 don't get to in their eba is that 711 00:27:18,830 --> 00:27:16,400 something that might be considered as a 712 00:27:23,110 --> 00:27:18,840 get ahead task for the the american 713 00:27:25,029 --> 00:27:23,120 ebay for the u.s eva you said 714 00:27:27,750 --> 00:27:25,039 um yeah for the russian one the 715 00:27:30,310 --> 00:27:27,760 launching of the the sphere satellite is 716 00:27:31,430 --> 00:27:30,320 that something if the russian cosmonauts 717 00:27:32,470 --> 00:27:31,440 don't get to it is that something that 718 00:27:35,110 --> 00:27:32,480 might be 719 00:27:36,549 --> 00:27:35,120 added to the list of get ahead for the 720 00:27:38,870 --> 00:27:36,559 american epa 721 00:27:40,789 --> 00:27:38,880 um it's a purely russian experiment and 722 00:27:43,269 --> 00:27:40,799 so we would have no plans to add that to 723 00:27:44,630 --> 00:27:43,279 the u.s eva and it's specifically been 724 00:27:46,549 --> 00:27:44,640 designed you know the trajectory and 725 00:27:48,149 --> 00:27:46,559 everything that we've analyzed the crew 726 00:27:49,510 --> 00:27:48,159 will go out on the eva ladder and push 727 00:27:50,630 --> 00:27:49,520 it aft 728 00:27:51,990 --> 00:27:50,640 and so 729 00:27:55,430 --> 00:27:52,000 that doesn't really sink well with our 730 00:27:57,990 --> 00:27:55,440 u.s eva uh it is just a purely russian 731 00:28:00,389 --> 00:27:58,000 type experiment 732 00:28:02,789 --> 00:28:00,399 okay thanks okay thanks denise 733 00:28:04,950 --> 00:28:02,799 uh are there any us here tina 734 00:28:05,990 --> 00:28:04,960 okay we're gonna wrap it up uh before we 735 00:28:07,350 --> 00:28:06,000 step away let's take a look at our 736 00:28:09,190 --> 00:28:07,360 broadcast coverage here on nasa 737 00:28:11,510 --> 00:28:09,200 television for these two spacewalks the 738 00:28:14,149 --> 00:28:11,520 first one coming up on august 20th our 739 00:28:15,029 --> 00:28:14,159 coverage will begin at 9 00 a.m central 740 00:28:17,430 --> 00:28:15,039 time 741 00:28:19,269 --> 00:28:17,440 with the eva due to begin at 9 40 and 742 00:28:21,269 --> 00:28:19,279 again will last uh close to six six and 743 00:28:23,430 --> 00:28:21,279 a half hours uh we'll be back on august 744 00:28:25,510 --> 00:28:23,440 30th for the u.s spacewalk which our 745 00:28:28,149 --> 00:28:25,520 coverage will begin at six a.m central 746 00:28:29,590 --> 00:28:28,159 time uh 7 a.m eastern time 747 00:28:32,149 --> 00:28:29,600 the actual spacewalk itself will start 748 00:28:35,990 --> 00:28:32,159 about an hour and 15 minutes later at 7 749 00:28:37,830 --> 00:28:36,000 15 a.m central time 8 15 a.m eastern and 750 00:28:39,990 --> 00:28:37,840 again that will last about six and a